Transport of vacuum reclaimer drums

Project cargo operations take long. They need careful planning and choosing the right professionals is essential.

Execution is usually split in two phases.

Day 1
Usually during weekends we need to prepare the cargo for the arrival of the ship. So, the road transport from site till the port storage area takes place.

It goes dead slow and it usually involves a lot of stops, cable lifting, road furniture removal, road works and driving towards the opposite direction while special permits and police escorts are granted.

This time our experienced team concluded on the transport of 3xMeg Vacuum reclaimer drums – l/bh 1590x710x710 cm – 77500 kgs each

To be continued….

When #shipping #projectcargo #thinkofcosmatos